{
  "schemaVersion": "1.0",
  "retrievedAt": "2026-09-11T13:10:40.066703+00:00",
  "title": "Selected public GWW renewals and upgrades",
  "sources": {
    "exford-bridge-water": {
      "label": "Exford to Bridge Road watermain upgrade",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/exford-bridge-road-watermain-upgrade",
      "finalUrl": "https://www.gww.com.au/exford-bridge-road-watermain-upgrade",
      "retrievedAt": "2026-09-11T13:10:38.106000+00:00",
      "type": "public project page",
      "archive": "originals/exford-bridge-water.html",
      "sha256": "9dc3840107892b3f82005ef24c2d312f1280804561cc6d973fca4f2072319516",
      "textArchive": "originals/exford-bridge-water.txt",
      "textSha256": "81c5045744d8961aa837103d3962058ac160fb0ba15c678df495f15adcac9bcc"
    },
    "francis-street-water": {
      "label": "Francis Street water main renewal",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/francis-street-water-main-renewal",
      "finalUrl": "https://www.gww.com.au/francis-street-water-main-renewal",
      "retrievedAt": "2026-09-11T13:10:38.194490+00:00",
      "type": "public project page",
      "archive": "originals/francis-street-water.html",
      "sha256": "b5737b69cbb5227b4b2fa5f7832fe7fa008bed44e015ea265c2ff91161ed688c",
      "textArchive": "originals/francis-street-water.txt",
      "textSha256": "8671ccc69d811d089d3561b41c70e01051bcf3df5688f9ac27ecbd0882386aa9"
    },
    "queen-street-water": {
      "label": "Queen Street water main renewal",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/queen-street-water-main-renewal",
      "finalUrl": "https://www.gww.com.au/queen-street-water-main-renewal",
      "retrievedAt": "2026-09-11T13:10:37.954813+00:00",
      "type": "public project page",
      "archive": "originals/queen-street-water.html",
      "sha256": "8b0cc8995cd2f90f7d28d3ef0eb891c67631a710aedc5ad44d11fea4dbf8be24",
      "textArchive": "originals/queen-street-water.txt",
      "textSha256": "7931fed67b4dadf68f96547d39ae2a9991112fe0d0001d57ccd2c7e82bf887af"
    },
    "siddeley-street-sewer": {
      "label": "Siddeley Street sewer upgrade",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/siddeley-street-sewer-upgrade",
      "finalUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/siddeley-street-sewer-upgrade",
      "retrievedAt": "2026-09-11T13:10:38.725256+00:00",
      "type": "public project page",
      "archive": "originals/siddeley-street-sewer.html",
      "sha256": "83b0e73179b76fd1216b9e2a28658419dca1dd7c0a218ccc32e67f6f15aa1b49",
      "textArchive": "originals/siddeley-street-sewer.txt",
      "textSha256": "8574e8e78e7c06ad7e8f046f2b5ec70736fbc95f5a7067d051caa4b2d5ac0278"
    },
    "romsey-water-filtration": {
      "label": "Romsey Water Filtration Plant",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/romsey-water-filtration-plant",
      "finalUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/romsey-water-filtration-plant",
      "retrievedAt": "2026-09-11T13:10:38.966845+00:00",
      "type": "public project page",
      "archive": "originals/romsey-water-filtration.html",
      "sha256": "1838b8621b317e36d4c1ae9b1db9d79692454d2800bd96075e40959b502f1168",
      "textArchive": "originals/romsey-water-filtration.txt",
      "textSha256": "56ebe529d4b5ce9940f6334ada0a516aa180a1f71b195471549d504a9a219a0a"
    },
    "gisborne-recycled-plant": {
      "label": "Gisborne Recycled Water Plant upgrade",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/gisborne-recycled-water-plant-upgrade",
      "finalUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/gisborne-recycled-water-plant-upgrade",
      "retrievedAt": "2026-09-11T13:10:39.424649+00:00",
      "type": "public project page",
      "archive": "originals/gisborne-recycled-plant.html",
      "sha256": "8e512d8a3d5433f650ca0d5870caeb16826b96e3147bedd5b82fff48db8f555f",
      "textArchive": "originals/gisborne-recycled-plant.txt",
      "textSha256": "eb9cbd06b301ebe47452a2fe6c9b69245735fde80dce394c11d31b46e0e6f619"
    },
    "melton-recycled-upgrades": {
      "label": "Melton Recycled Water Plant Upgrades",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/melton-recycled-water-plant-upgrades",
      "finalUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/melton-recycled-water-plant-upgrades",
      "retrievedAt": "2026-09-11T13:10:39.450687+00:00",
      "type": "public project page",
      "archive": "originals/melton-recycled-upgrades.html",
      "sha256": "44770a76169337da5c23e176374eef320c6cb9c53ab45074680367bf58d407fe",
      "textArchive": "originals/melton-recycled-upgrades.txt",
      "textSha256": "383b19e00973e54e317e06dbe7fb40b8626cf3c8fa492529ecd7767d13398616"
    },
    "western-irrigation-network": {
      "label": "Western Irrigation Network",
      "publisher": "Greater Western Water",
      "url": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/western-irrigation-network",
      "finalUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/western-irrigation-network",
      "retrievedAt": "2026-09-11T13:10:39.883021+00:00",
      "type": "public project page",
      "archive": "originals/western-irrigation-network.html",
      "sha256": "08d86d70af0802caa5fde33ceb6f1a649067f3322875faf5386f8e554262bd41",
      "textArchive": "originals/western-irrigation-network.txt",
      "textSha256": "19cdb4554dd5e711a5c6dc5d8e81a02683ebf67eda49711e516fed11df264c44"
    },
    "rotary-park-sewer-pump": {
      "label": "Rotary Park, Gisborne Sewer Pump Station Upgrade",
      "publisher": "Greater Western Water",
      "url": "https://yoursay.gww.com.au/gisbornerotarypark",
      "finalUrl": "https://yoursay.gww.com.au/gisbornerotarypark",
      "retrievedAt": "2026-09-11T13:10:40.066703+00:00",
      "type": "public project page",
      "archive": "originals/rotary-park-sewer-pump.html",
      "sha256": "d49f579b81021fdbdc1ca33430a91f449a5934e19dcbe4a55c5ced9b9504c3bf",
      "textArchive": "originals/rotary-park-sewer-pump.txt",
      "textSha256": "a34cc40dcef4512246f9bc12900afa6ff8c22081ff493691d0ef57155c88328f"
    }
  },
  "limitations": [
    "A curated sample of nine public projects and staged programs; this is not the complete GWW capital or renewal program.",
    "Statuses paraphrase the retrieved project pages. Published schedules and directory listings do not independently confirm current construction progress or completion.",
    "Source-updated dates are null because a reliable project-page revision date was not established. Retrieval dates are separate from construction dates.",
    "No verified project geometry or asset coordinates have been extracted. All latitude/longitude values are null; do not place a project pin at an SA2 centroid.",
    "Related SA2 codes are broad locality associations only, not project-boundary or service-catchment intersections. They do not establish which properties benefit.",
    "An empty related-area list means no association to the eight selected SA2s was established in this sample; it does not mean no projects or investment exist there.",
    "Project presence does not demonstrate adequate investment, risk reduction, spare capacity or a causal response to population growth or incidents.",
    "Recycled-water treatment projects also support sewerage services. The primary type is a display category, not an exclusive engineering classification."
  ],
  "projects": [
    {
      "id": "exford-bridge-water",
      "title": "Exford to Bridge Road watermain upgrade",
      "type": "water",
      "status": "Early works; main construction planned",
      "location": "Melton South: Rees, Exford and Bridge roads",
      "summary": "Three permanent underground pipelines are intended to replace the interim above-ground supply and improve pressure during peak demand in Melton South.",
      "sourceUrl": "https://www.gww.com.au/exford-bridge-road-watermain-upgrade",
      "relatedAreaCodes": [
        "213041578"
      ],
      "areaAssociationBasis": "The source explicitly identifies Melton South. Associated with the selected Melton South – Weir Views SA2 for locality context only; no route or service catchment has been intersected.",
      "statusNote": "The page schedules early works from 10 July 2026 and expects main construction in mid to late 2026; no construction completion is confirmed.",
      "evidenceAnchors": [
        "three new permanent underground water pipelines",
        "Main construction is expected to begin mid to late 2026"
      ],
      "sourceId": "exford-bridge-water",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "francis-street-water",
      "title": "Francis Street water main renewal",
      "type": "water",
      "status": "Renewal announced",
      "location": "Melbourne CBD: Francis Street between King and Spencer streets; adjoining King Street",
      "summary": "Renewal covers Francis Street and part of King Street. GWW identifies the 1957 water main as approaching the end of its operational life.",
      "sourceUrl": "https://www.gww.com.au/francis-street-water-main-renewal",
      "relatedAreaCodes": [],
      "areaAssociationBasis": null,
      "statusNote": "The published project page describes renewal works but does not confirm a current construction stage or completion date.",
      "evidenceAnchors": [
        "between King Street and Spencer Street",
        "constructed in 1957"
      ],
      "sourceId": "francis-street-water",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "queen-street-water",
      "title": "Queen Street water main renewal",
      "type": "water",
      "status": "Renewal announced",
      "location": "Melbourne CBD: Queen Street between Bourke and Lonsdale streets",
      "summary": "Replacement of the Queen Street water main, built in 1962, is intended to maintain reliable supply. Works are planned in stages.",
      "sourceUrl": "https://www.gww.com.au/queen-street-water-main-renewal",
      "relatedAreaCodes": [],
      "areaAssociationBasis": null,
      "statusNote": "The source states an expected 12–14 week duration but supplies no verified start or completion date in the main project content.",
      "evidenceAnchors": [
        "between Bourke and Lonsdale Streets",
        "constructed in 1962"
      ],
      "sourceId": "queen-street-water",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "siddeley-street-sewer",
      "title": "Siddeley Street sewer upgrade",
      "type": "sewer",
      "status": "Construction underway",
      "location": "Melbourne CBD and Docklands: Flinders Lane, Spencer Street, Siddeley Street and Wurundjeri Way",
      "summary": "About 750 metres of new sewer is intended to double capacity along the project corridor. The page describes shaft and piling works.",
      "sourceUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/siddeley-street-sewer-upgrade",
      "relatedAreaCodes": [],
      "areaAssociationBasis": null,
      "statusNote": "The current-works section identifies piling and shaft construction at Siddeley and Spencer streets.",
      "evidenceAnchors": [
        "approximately 750 metres",
        "Piling works at Siddeley Street and Spencer Street"
      ],
      "sourceId": "siddeley-street-sewer",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "romsey-water-filtration",
      "title": "Romsey Water Filtration Plant",
      "type": "water",
      "status": "Construction underway",
      "location": "Romsey: near Romsey and Glenfern roads",
      "summary": "The plant upgrade is designed to raise drinking-water treatment capacity from 2.65 to 4.6 million litres per day and add UV disinfection.",
      "sourceUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/romsey-water-filtration-plant",
      "relatedAreaCodes": [],
      "areaAssociationBasis": null,
      "statusNote": "Construction began in January 2025; the published expected completion is mid-2027.",
      "evidenceAnchors": [
        "2.65 million litres per day to 4.6 million litres per day",
        "completion expected in mid-2027"
      ],
      "sourceId": "romsey-water-filtration",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "gisborne-recycled-plant",
      "title": "Gisborne Recycled Water Plant upgrade",
      "type": "recycled",
      "status": "Testing / commissioning",
      "location": "Gisborne: Haywood Drive",
      "summary": "A new treatment facility is designed to increase wastewater treatment capacity from 1.5 to 3.65 million litres per day. Recycled-water quality testing follows construction.",
      "sourceUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/gisborne-recycled-water-plant-upgrade",
      "relatedAreaCodes": [],
      "areaAssociationBasis": null,
      "statusNote": "The page states construction was completed in late 2025 and recycled-water quality is currently being tested. Do not describe the construction as ongoing.",
      "evidenceAnchors": [
        "Construction of the plant was completed in late 2025",
        "currently testing the quality of the recycled water"
      ],
      "sourceId": "gisborne-recycled-plant",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "melton-recycled-upgrades",
      "title": "Melton Recycled Water Plant Upgrades",
      "type": "recycled",
      "status": "Delivery and planning",
      "location": "Melton Recycled Water Plant; biosolids program also receives material from Gisborne, Sunbury and Woodend",
      "summary": "Biosolids drying works are underway, with inlet, dewatering, equipment, electrical and wet-weather transfer improvements in planning. Some treatment and desludging work is complete.",
      "sourceUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/melton-recycled-water-plant-upgrades",
      "relatedAreaCodes": [
        "213041577",
        "213041578",
        "213041358",
        "210041240",
        "210041540"
      ],
      "areaAssociationBasis": "The source identifies Melton and Sunbury among the communities whose plants supply the biosolids program. Codes associate the selected SA2s with these named localities only; they do not locate the plant or define its catchment.",
      "statusNote": "This is a multi-stage program: the source separates work underway, work in planning and completed components.",
      "evidenceAnchors": [
        "Works underway",
        "Works in planning",
        "Melton, Gisborne, Sunbury and Woodend RWPs"
      ],
      "sourceId": "melton-recycled-upgrades",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "western-irrigation-network",
      "title": "Western Irrigation Network",
      "type": "recycled",
      "status": "Existing stages complete; expansion planned",
      "location": "Parwan–Balliang agricultural district, with Melton, Bacchus Marsh and future Sunbury plant connections",
      "summary": "The network reuses recycled water for irrigation. Published future stages include Parwan–Balliang storage in 2027–28 and a Sunbury–Melton interconnector in 2029–30.",
      "sourceUrl": "https://www.gww.com.au/faults-works/upgrades-projects/planned-works-projects/western-irrigation-network",
      "relatedAreaCodes": [
        "213041353",
        "213041577",
        "213041578",
        "213041358",
        "210041240",
        "210041540"
      ],
      "areaAssociationBasis": "Bacchus Marsh, Melton and Sunbury are explicitly named in the network description and plant connections. Codes are broad locality associations, not project-boundary intersections, beneficiary counts or pipe locations.",
      "statusNote": "Most initial milestones are marked complete. Two future milestones remain in planning; this record represents the ongoing staged program.",
      "evidenceAnchors": [
        "Planning for 2027-2028",
        "Planning for 2029-2030"
      ],
      "sourceId": "western-irrigation-network",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    },
    {
      "id": "rotary-park-sewer-pump",
      "title": "Rotary Park, Gisborne Sewer Pump Station Upgrade",
      "type": "sewer",
      "status": "Published construction schedule",
      "location": "Rotary Park, Gisborne",
      "summary": "A new sewage storage tank is intended to double pump-station storage capacity and reduce overflow risk. The published construction window runs to September 2026.",
      "sourceUrl": "https://yoursay.gww.com.au/gisbornerotarypark",
      "relatedAreaCodes": [],
      "areaAssociationBasis": null,
      "statusNote": "The page schedules works from April 2025 to September 2026. Actual completion has not been confirmed by the retrieved page.",
      "evidenceAnchors": [
        "new, high-capacity sewage storage tank",
        "completed by September 2026"
      ],
      "sourceId": "rotary-park-sewer-pump",
      "sourceUpdatedAt": null,
      "latitude": null,
      "longitude": null,
      "coordinateBasis": null
    }
  ]
}